i. Monitoring
a. Load Leveling System
Identify distribution of load on each wheel in a bogie.

ii. Maintenance
a. Bogie Press
Testing train bogie assembly mounted on wheels by applying required vertical load onto bogie to check deflection of suspension system, bogie setup and measure individual wheel
loads.

b. Bogie Frame Rotator
Lift and rotate a bogie frame for routine inspection.

c. Dummy Bogie
Support train carbody upon disassembling of bogies.

d. Bogie stand
Support a bogie frame for installation or dismantling of supporting
components (excluding wheel set, traction motors and gear box)
