Providing Professional Engineering Services

i. Monitoring

a. Load Leveling System

Identify distribution of load on each wheel in a bogie.

ii. Maintenance

a. Bogie Press

Testing train bogie assembly mounted on wheels by applying required vertical load onto bogie to check deflection of suspension system, bogie setup and measure individual wheel
loads.

b. Bogie Frame Rotator

Lift and rotate a bogie frame for routine inspection.

c. Dummy Bogie

Support train carbody upon disassembling of bogies.

d. Bogie stand

Support a bogie frame for installation or dismantling of supporting
components (excluding wheel set, traction motors and gear box)