Trendline

TREND SETTERS IN RAIL LINE

MAIL US
info@trendline-malaysia.com

CALL US
+603 6201 6767

i. Monitoring

a. Load Leveling System

Identify distribution of load on each wheel in a bogie.

ii. Maintenance

a. Bogie Press

Testing train bogie assembly mounted on wheels by applying required vertical load onto bogie to check deflection of suspension system, bogie setup and measure individual wheel
loads.

b. Bogie Frame Rotator

Lift and rotate a bogie frame for routine inspection.

c. Dummy Bogie

Support train carbody upon disassembling of bogies.

d. Bogie stand

Support a bogie frame for installation or dismantling of supporting
components (excluding wheel set, traction motors and gear box)

Share Now

Trend Line (Malaysia) Sdn Bhd

Level 3, Kipark Corporate Tower, Jalan Seri Utara 1, Off Jalan Ipoh, 68100 Kuala Lumpur, Malaysia

info@trendline-malaysia.com

We reply within 24 hours

Have any questions?‚Äč

+603 6201 6767

Working Hours

Mon-Fri, 10am until 6pm